Superior foods | industrial & logistics buildings | a production facility, intended for the process of chilling chickens before further processing, with a machine room within the existing factory complex | Šid | Serbia | 865 | 2024 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 519.000 | | | | | | | | | | | | | | | | | |
Pinoles | industrial & logistics buildings | production facility for cutting, edging and drilling wood-based sheet materials, for producing custom-made furniture and furnishing interiors | Krnješevci | Serbia | 10.633 | 2024 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 5.316.500 | | | | | | | | | | | | | | | | | |
Drawing | industrial & logistics buildings | warehouse & business facility with rack storage space | Novi Banovci | Serbia | 1.584 | 2024 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 950.400 | | | | | | | | | | | | | | | | | |
BMVR | industrial & logistics buildings | warehouse & business facility with rack storage space | Nova Pazova | Serbia | 4.038 | 2024 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 2.019.000 | | | | | | | | | | | | | | | | | |
Enterijer Janković | industrial & logistics buildings | distribution warehouse, with an ambient and partly temperature regime in place, in the function of retailing consumer goods, with administrative spaces | Novi Sad | Serbia | 5.759 | 2024 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 2.899.500 | | | | | | | | | | | | | | | | | |
Rapidex | industrial & logistics buildings | commercial facility intended for the wholesale of spare parts for commercial vehicles | Belgrade | Serbia | 1.201 | 2024 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 720.600 | | | | | | | | | | | | | | | | | |
ABC grafika | industrial & logistics buildings | commercial & business facility - print shop with a workshop for printing on commercial vehicles of various categories | Nova Pazova | Serbia | 307 | 2024 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 214.900 | | | | | | | | | | | | | | | | | |
Profi industrija | industrial & logistics buildings | warehouse & business facility with rack storage space | Ugrinovci | Serbia | 3.807 | 2024 | preliminary design brief | | 1.903.500 | | | | | | | | | | | | | | | | | |
Avala Villa | residential buildings | multi-family house in Avala with three apartments and a tavern with an attached driveway with parking spaces, a landscaped yard and an outdoor pool | Belgrade | Serbia | 700 | 2024 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 525.000 | | | | | | | | | | | | | | | | | |
Car wash | public buildings | service facility for self-service washing of passenger vehicles | Belegiš | Serbia | 143 | 2024 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | | | | | | | | | | | | | | | | | | |
Baumaschinen | industrial & logistics buildings | warehouse & business facility with rack storage space | Surčin | Serbia | 8.057 | 2023 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 4.028.500 | | | | | | | | | | | | | | | | | |
Citwej | industrial & logistics buildings | coffee factory with office space and independent warehouses for rent | Kneževac | Serbia | 4.118 | 2023 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.853.100 | | | | | | | | | | | | | | | | | |
Poljobit | industrial & logistics buildings | warehouse and business facility for the sale of equipment and tools in agriculture and construction | Krnješevci | Serbia | 1.762 | 2023 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 273.100 | | | | | | | | | | | | | | | | | |
Nikola | commercial buildings | reconstruction of a multi-family house into a residential building with nine apartments | Lazarevac | Serbia | 908 | 2023 | preliminary design brief | | 4.544.000 | | | | | | | | | | | | | | | | | |
ST-Construction | commercial buildings | | Stara Pazova | Serbia | 7.003 | 2023 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | in progress | 4.201.800 | | | | | | | | | | | | | | | | | |
Ekobox | commercial buildings | | Stara Pazova | Serbia | 1.921 | 2023 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.440.750 | | | | | | | | | | | | | | | | | |
Merlon | commercial buildings | | Stara Pazova | Serbia | 4.449 | 2023 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 3.114.300 | | | | | | | | | | | | | | | | | |
Stanimirović 2 | residential buildings | | Belgrade | Serbia | 248 | 2023 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 222.400 | | | | | | | | | | | | | | | | | |
Stanimirović 1 | residential buildings | | Belgrade | Serbia | 248 | 2023 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | | 186.000 | | | | | | | | | | | | | | | | | |
Kresović | residential buildings | | Novi Banovci | Serbia | 249 | 2023 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 186.750 | | | | | | | | | | | | | | | | | |
Simonović | industrial & logistics buildings | business - warehouse center for the sale and service of forklifts | Novi Banovci | Serbia | 5.940 | 2022 | preliminary design brief | | 2.850.000 | | | | | | | | | | | | | | | | | |
Ecomex | industrial & logistics buildings | coffee factory with office space | Krnješevci | Serbia | 5.102 | 2022 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 2.280.000 | | | | | | | | | | | | | | | | | |
As Invest 3 | commercial buildings | | Lazarevac | Serbia | 1.580 | 2022 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.137.600 | | | | | | | | | | | | | | | | | |
As Invest 2 | commercial buildings | | Lazarevac | Serbia | 2.118 | 2022 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.524.960 | | | | | | | | | | | | | | | | | |
Karamarković 2 | commercial buildings | | Novi Banovci | Serbia | 4.807 | 2022 | preliminary design brief | | 3.364.900 | | | | | | | | | | | | | | | | | |
Belm | public buildings | reconstruction of a part of a textile factory into a commercial facility - shopping mall | Novi Pazar | Serbia | 3.700 | 2022 | preliminary design brief | under construction | | | | | | | | | | | | | | | | | | |
WFS2020 | industrial & logistics buildings | phased construction of warehouse - business facilities | Stara Pazova | Serbia | 5.841 | 2021 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 2.336.400 | | | | | | | | | | | | | | | | | |
Doming | industrial & logistics buildings | reconstruction and extension of a functional unit intended for storage and business with construction equipment (thermal, hydro, sanitary, electrical and ceramic) | Šimanovci | Serbia | 11.920 | 2021 | preliminary design brief | under construction | 4.768.000 | | | | | | | | | | | | | | | | | |
Biogroup | industrial & logistics buildings | cold storage facility (for preparation and freezing of fruit) | Šimanovci | Serbia | 3.172 | 2021 | preliminary design brief | under construction | 1.268.800 | | | | | | | | | | | | | | | | | |
Mlin produkt | industrial & logistics buildings | facility for the production and assembly of locksmith elements | Grocka | Serbia | 1.203 | 2021 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 480.000 | | | | | | | | | | | | | | | | | |
Minotti | industrial & logistics buildings | warehouse complex with business spaces and commercial showroom | Šimanovci | Serbia | 15.347 | 2021 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision, consulting, construction management | under construction | 6.955.600 | Structura concept | | | | | | | | | | | | | | | | |
Karamarković 1 | commercial buildings | | Novi Banovci | Serbia | 1.765 | 2021 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.235.500 | | | | | | | | | | | | | | | | | |
Kresović 4 | commercial buildings | | Novi Banovci | Serbia | 5.152 | 2021 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 3.606.400 | | | | | | | | | | | | | | | | | |
Stojanović 2 | residential buildings | | Irig | Serbia | 134 | 2021 | preliminary design brief | | 40.200 | | | | | | | | | | | | | | | | | |
Stojanović 1 | residential buildings | | Irig | Serbia | 145 | 2021 | preliminary design brief | | 43.500 | | | | | | | | | | | | | | | | | |
Knežević | residential buildings | | Batajnica | Serbia | 889 | 2021 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 266.700 | | | | | | | | | | | | | | | | | |
Kocić | residential buildings | | Stari Banovci | Serbia | 472 | 2021 | preliminary design brief | | 118.000 | | | | | | | | | | | | | | | | | |
NCR | interiors | canteen kitchen in an office building | Beograd | Serbia | 685 | 2021 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 700.000 | | | | | | | | | | | | | | | | | |
Minotti | interiors | showroom and office spaces | Šimanovci | Serbia | 2.954 | 2021 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 3.249.400 | | | | | | | | | | | | | | | | | |
AdvanceBoat | industrial & logistics buildings | ship production with business spaces and commercial showroom | Belgrade | Serbia | 2.675 | 2020 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.714.700 | | | | | | | | | | | | | | | | | |
Pepsi A&P | industrial & logistics buildings | reconstruction and adaptation of a warehouse into a facility intended for the production of juices | Dobanovci | Serbia | 2.370 | 2020 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 1.040.700 | | | | | | | | | | | | | | | | | |
Birk | industrial & logistics buildings | warehouse facility with offices and business apartments | Nova Pazova | Serbia | 717 | 2020 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 111.300 | Romb Art | | | | | | | | | | | | | | | | |
Open city | commercial buildings | study of the city block | | | 79.500 | 2020 | preliminary design brief | | | Romb Art | | | | | | | | | | | | | | | | |
Petrović | interiors | apartment in tower West 65 | Beograd | Serbia | 124 | 2020 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 136.400 | | | | | | | | | | | | | | | | | |
Guša | industrial & logistics buildings | warehouse | Stara Pazova | Serbia | 4.897 | 2019 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 760.000 | Romb Art | | | | | | | | | | | | | | | | |
Lipovac | industrial & logistics buildings | warehouse facility with independent business spaces and tourist apartments | Vranovići | Montenegro | 1.048 | 2019 | preliminary design brief | | 162.650 | Romb Art | | | | | | | | | | | | | | | | |
Felt | industrial & logistics buildings | warehouse facility with business operation spaces within the existing complex of a company in the field of electrical installation | Ruma | Serbia | 2.590 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 1.660.450 | Romb Art | | | | | | | | | | | | | | | | |
Ideal Kompani | industrial & logistics buildings | distribution center with business offices | Dobanovci | Serbia | 6.105 | 2019 | preliminary design brief | | 2.293.900 | | | | | | | | | | | | | | | | | |
Simonović | industrial & logistics buildings | business center with warehouse | Novi Banovci | Serbia | 6.178 | 2019 | preliminary design brief | | 2.321.300 | | | | | | | | | | | | | | | | | |
Kresović | commercial buildings | | Novi Banovci | Serbia | 4.723 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 3.343.600 | | | | | | | | | | | | | | | | | |
Bioc | commercial buildings | | Novi Banovci | Serbia | 8.594 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 6.015.800 | | | | | | | | | | | | | | | | | |
Joy of Construction III | commercial buildings | | Zemun, Ugrinovačka | Serbia | 3.743 | 2019 | | | 2.620.100 | | | | | | | | | | | | | | | | | |
As Invest | commercial buildings | | Lazarevac | Serbia | 1.175 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 822.500 | | | | | | | | | | | | | | | | | |
Strugar | commercial buildings | | Bečići | Montenegro | 612 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 367.200 | | | | | | | | | | | | | | | | | |
Most invest | commercial buildings | | Bečići | Montenegro | 782 | 2019 | preliminary design brief | | 469.200 | | | | | | | | | | | | | | | | | |
Ekonomik | commercial buildings | | Novi Banovci | Serbia | 1.815 | 2019 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | under construction | 1.089.000 | | | | | | | | | | | | | | | | | |
Most Invest II | residential buildings | | Radovići | Montenegro | 650 | 2019 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | | 169.000 | | | | | | | | | | | | | | | | | |
Most Invest I | residential buildings | | Radovići | Montenegro | 525 | 2019 | preliminary design brief | | 136.500 | | | | | | | | | | | | | | | | | |
Strugar | residential buildings | | Krašići | Montenegro | 226 | 2019 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 58.750 | | | | | | | | | | | | | | | | | |
Riva | public buildings | restaurant | Budva | Montenegro | 582 | 2019 | preliminary design brief | completed | 349.200 | | | | | | | | | | | | | | | | | |
Albon II | industrial & logistics buildings | a business center with a warehouse, a factory for the production of connecting rods for the needs of the automotive industry - Phase II | Ruma | Serbia | 11.178 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 4.200.000 | | | | | | | | | | | | | | | | | |
Albon I dogradnja | industrial & logistics buildings | extension of the factory for the production of connecting rods for the needs of the automotive industry - Phase I | Ruma | Serbia | 2.508 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 563.400 | | | | | | | | | | | | | | | | | |
Minotti - Aqua Casa | industrial & logistics buildings | business-warehouse complex with a commercial exhibition space for trade in sanitary equipment and ceramics | Surčin | Serbia | 9.184 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), consulting | | 4.162.400 | | | | | | | | | | | | | | | | | |
Put Inženjering | industrial & logistics buildings | factory for the production of prefabricated reinforced concrete elements | Nova Pazova | Serbia | 18.367 | 2018 | urban project design, preliminary design brief | completed | 6.650.000 | | | | | | | | | | | | | | | | | |
Open Mind | industrial & logistics buildings | warehouse facility with business offices | Šimanovci | Serbia | 32.181 | 2018 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 10.560.000 | | | | | | | | | | | | | | | | | |
Tisa Industry | industrial & logistics buildings | commercial warehouse facility | Ugrinovci | Serbia | 724 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 270.000 | | | | | | | | | | | | | | | | | |
Master Flex | industrial & logistics buildings | warehouse | Stara Pazova | Serbia | 4.262 | 2018 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 1.500.000 | | | | | | | | | | | | | | | | | |
Španović | commercial buildings | | Novi Banovci | Serbia | 1.218 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 343.100 | | | | | | | | | | | | | | | | | |
Krnjaić | commercial buildings | | Stari Banovci | Serbia | 266 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 61.900 | | | | | | | | | | | | | | | | | |
Joy of Construction II | commercial buildings | | Zemun, Živka Petrovića | Serbia | 1.483 | 2018 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 370.000 | | | | | | | | | | | | | | | | | |
Joy of Construction I | commercial buildings | | Zemun, Rade Končar | Serbia | 3.329 | 2018 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 949.400 | | | | | | | | | | | | | | | | | |
Komazec | residential buildings | | Sremska Mitrovica | Serbia | 363 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | under construction | 90.000 | | | | | | | | | | | | | | | | | |
Skoko | residential buildings | | Nova Pazova | Serbia | 353 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 93.000 | | | | | | | | | | | | | | | | | |
Vojvodić | residential buildings | | Nova Pazova | Serbia | 490 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 132.400 | | | | | | | | | | | | | | | | | |
Tanazević II | residential buildings | | Belgrade | Serbia | 1.190 | 2018 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 1.000.000 | | | | | | | | | | | | | | | | | |
Open Mind | industrial & logistics buildings | logistics center with four storage facilities | Stara Pazova | Serbia | 73.600 | 2017 | urban project design, preliminary design brief | | 33.357.150 | | | | | | | | | | | | | | | | | |
Trampex II | industrial & logistics buildings | facility for the production and assembly of locksmith elements | Dobanovci | Serbia | 1.720 | 2017 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | under construction | 386.400 | | | | | | | | | | | | | | | | | |
Palisada | industrial & logistics buildings | warehouse | Dobanovci | Serbia | 3.000 | 2017 | preliminary design brief | | 1.055.850 | | | | | | | | | | | | | | | | | |
Mont Konstruktor | commercial buildings | | Beograd, Golsfordijeva | Serbia | 2.650 | 2017 | preliminary design brief | | 2.200.000 | | | | | | | | | | | | | | | | | |
Tanazević I | residential buildings | | Beograd | Serbia | 1.190 | 2017 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.000.000 | AbVd Studio | | | | | | | | | | | | | | | | |
Mažinjanin | residential buildings | | Stara Pazova | Serbia | 200 | 2017 | | | 52.000 | | | | | | | | | | | | | | | | | |
Srđana | residential buildings | | Stara Pazova | Serbia | 380 | 2017 | preliminary design brief | under construction | 95.000 | | | | | | | | | | | | | | | | | |
Zdjelar | public buildings | nursing home | Batajnica | Serbia | 800 | 2017 | preliminary design brief | | 400.000 | | | | | | | | | | | | | | | | | |
Biblioteka za decu Pinocchio | competitions | children's library within the Pinocchio theme park - reconstruction of an old factory complex | Kolodi | Italy | 24.978 | 2017 | preliminary design brief | buy-out (honorable mention) | | | | | | | | | | | | | | | | | | |
Gradski blok | competitions | central square with city functions and housing (area includes 23.240 m2) | San Pri | France | 12.170 | 2017 | preliminary design brief | finalists | | AbVd Studio | | | | | | | | | | | | | | | | |
Estrima | industrial & logistics buildings | business complex for storage, processing and distribution of metal sheets and pipes | Nova Pazova | Serbia | 3.572 | 2016 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), | | 1.257.150 | AbVd Studio | | | | | | | | | | | | | | | | |
La Linea Verde | industrial & logistics buildings | a factory for chopping, washing and packaging of salads | Dobrinci | Serbia | 5.700 | 2016 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 2.850.000 | | | | | | | | | | | | | | | | | |
Kendy | industrial & logistics buildings | warehouse | Zemun polje | Serbia | 1.700 | 2016 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 550.000 | | | | | | | | | | | | | | | | | |
Drawing | industrial & logistics buildings | sale and service of forklifts and measuring devices with storage | Novi Banovci | Serbia | 1.000 | 2016 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 600.000 | | | | | | | | | | | | | | | | | |
Belm | industrial & logistics buildings | reconstruction of part of a factory for textile finishing | Novi Pazar | Serbia | 12.000 | 2016 | preliminary design brief | | 100.000 | | | | | | | | | | | | | | | | | |
Mont Konstruktor | commercial buildings | | Beograd, Knjeginje Zorke | Serbia | 1.700 | 2016 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.700.000 | | | | | | | | | | | | | | | | | |
Antonovka | residential buildings | | Moscow | Russia | 760 | 2016 | preliminary design brief | | 1.200.000 | | | | | | | | | | | | | | | | | |
Živković | residential buildings | | Stari Banovci | Serbia | 150 | 2016 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 39.000 | | | | | | | | | | | | | | | | | |
Marković | residential buildings | | Nova Pazova | Serbia | 259 | 2016 | preliminary design brief | | 67.350 | | | | | | | | | | | | | | | | | |
Nicpuro | public buildings | science center | Moskva | Russia | 7.400 | 2016 | preliminary design brief | | 2.500.000 | | | | | | | | | | | | | | | | | |
Hotel Atrijum | public buildings | hotel, pool, spa and conference area - reconstruction | Tulska oblast | Russia | 6.500 | 2016 | preliminary design brief | | 4.000.000 | | | | | | | | | | | | | | | | | |
Dorotea Berry II | interiors | family villa | San Sebastian | Spain | 250 | 2016 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 225.000 | | | | | | | | | | | | | | | | | |
Dorotea Berry I | interiors | family villa | San Sebastian | Spain | 250 | 2016 | preliminary design brief | | 225.000 | | | | | | | | | | | | | | | | | |
Mont Konstruktor | interiors | apartments | Beograd, Knjeginje Zorke | Serbia | 1.700 | 2016 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.700.000 | | | | | | | | | | | | | | | | | |
LSH | competitions | hotel - open artistic city - reconstruction and integration of the old lighthouse | Sirakuza | Italy | 3.000 | 2016 | preliminary design brief | finalists | | | | | | | | | | | | | | | | | | |
Gradska galerija | competitions | gallery in the old city center | Beograd | Serbia | 786 | 2016 | preliminary design brief | II prize | | | | | | | | | | | | | | | | | | |
Blok 13 | competitions | arrangement of the city park and the philharmonic building | Beograd | Serbia | 472.000 | 2016 | preliminary design brief | buy-out | | | | | | | | | | | | | | | | | | |
Finelco | industrial & logistics buildings | extension of storage facilities | Šimanovci | Serbia | 433 | 2015 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | | 161.500 | | | | | | | | | | | | | | | | | |
Tenge | industrial & logistics buildings | issuing and service of construction machinery and equipment with business spaces | Krnješevci | Serbia | 1.535 | 2015 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 496.650 | | | | | | | | | | | | | | | | | |
Aranđelović | commercial buildings | | Beograd | Serbia | 822 | 2015 | preliminary design brief | | 411.000 | | | | | | | | | | | | | | | | | |
Đorđević | residential buildings | | Stara Pazova | Serbia | 178 | 2015 | | | 46.300 | | | | | | | | | | | | | | | | | |
Mihajlović | residential buildings | | Belgrade | Serbia | 730 | 2015 | preliminary design brief | | 189.800 | | | | | | | | | | | | | | | | | |
Skoko, Đurić I | residential buildings | | Zlatibor | Serbia | 384 | 2015 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 99.850 | | | | | | | | | | | | | | | | | |
Skoko, Đurić II | residential buildings | | Zlatibor | Serbia | 454 | 2015 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 118.050 | | | | | | | | | | | | | | | | | |
House MM | residential buildings | | Mongome | Equatorial Guinea | 505 | 2015 | preliminary design brief | | 131.300 | | | | | | | | | | | | | | | | | |
Perendija | residential buildings | | Nova Pazova | Serbia | 502 | 2015 | preliminary design brief | | 301.200 | | | | | | | | | | | | | | | | | |
Stambeni blok | competitions | social housing in Kamendin | Beograd | Serbia | 15.265 | 2015 | preliminary design brief | III prize | | | | | | | | | | | | | | | | | | |
DM Sat | industrial & logistics buildings | warehouse | Požarevac | Serbia | 3.077 | 2014 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.083.000 | | | | | | | | | | | | | | | | | |
Lames | industrial & logistics buildings | production facility with business offices | Sremska Mitrovica | Serbia | 6.497 | 2014 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 3.250.000 | | | | | | | | | | | | | | | | | |
Banjsko-hotelski kompleks | competitions | hotel, thermal baths and aqua park with outdoor pools and recreation areas | Palić | Serbia | 120.000 | 2014 | preliminary design brief | buy-out | | | | | | | | | | | | | | | | | | |
Blok 42 | competitions | city square, multi-purpose terminal, commercial spaces, business and housing (area includes 78.840 m2) | Beograd | Serbia | 340.000 | 2014 | preliminary design brief | buy-out | | | | | | | | | | | | | | | | | | |
Gradski trg | competitions | central square and park | Novigrad | Croatia | 9.500 | 2014 | preliminary design brief | | | | | | | | | | | | | | | | | | | |
Guggenheim | competitions | museum with open public space | Helsinki | Finland | 13.347 | 2014 | preliminary design brief | | | | | | | | | | | | | | | | | | | |
Centralni blok | competitions | public facilities and spaces, city functions and housing | Subotica | Serbia | 39.000 | 2014 | preliminary design brief | III prize | | | | | | | | | | | | | | | | | | |
Kendy | industrial & logistics buildings | warehouse | Batajnica | Serbia | 960 | 2013 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 336.000 | | | | | | | | | | | | | | | | | |
Almont | industrial & logistics buildings | addition of a warehouse within a warehouse-business facility | Belgrade | Serbia | 5.381 | 2013 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 2.690.500 | | | | | | | | | | | | | | | | | |
Logistički centar | industrial & logistics buildings | 9 warehouse facilities with business spaces | Ugrinovci | Serbia | 81.449 | 2013 | preliminary design brief | | 40.724.500 | | | | | | | | | | | | | | | | | |
Almont II | industrial & logistics buildings | warehouse facility with business offices | Šimanovci | Serbia | 6.701 | 2013 | preliminary design brief | | 3.015.450 | | | | | | | | | | | | | | | | | |
Bešlić | residential buildings | | Novi Banovci | Serbia | 553 | 2013 | allotment analysis, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 143.800 | | | | | | | | | | | | | | | | | |
Hotel | competitions | hotel and public city space | Baošići | Montenegro | 39.500 | 2013 | preliminary design brief | buy-out | | | | | | | | | | | | | | | | | | |
Blok 3 | competitions | residential block and public city space | Belgorod | Russia | 105.000 | 2013 | preliminary design brief | buy-out (honorable mention) | | | | | | | | | | | | | | | | | | |
Delta | competitions | urban planning of the Delta and port area | Rijeka | Croatia | 200.000 | 2013 | preliminary design brief | | | | | | | | | | | | | | | | | | | |
Albon I | industrial & logistics buildings | factory for the production of connecting rods for the needs of the automotive industry - Phase I | Ruma | Serbia | 9.000 | 2012 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 4.000.000 | | | | | | | | | | | | | | | | | |
Beohemija | industrial & logistics buildings | production and warehouse facility | Zrenjanin | Serbia | 16.000 | 2012 | preliminary design brief | | 4.920.000 | | | | | | | | | | | | | | | | | |
Milšped II | industrial & logistics buildings | storage facility within a logistics center | Krnješevci | Serbia | 17.235 | 2012 | preliminary design brief, building supervision | completed | 5.300.000 | | | | | | | | | | | | | | | | | |
Atlantic Grupa | industrial & logistics buildings | extension of a warehouse facility | Skoplje | Macedonia | 3.360 | 2012 | preliminary design brief | | 1.680.000 | | | | | | | | | | | | | | | | | |
Kresović | commercial buildings | | Novi Banovci | Serbia | 1.418 | 2012 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 523.000 | | | | | | | | | | | | | | | | | |
Mitrović | residential buildings | | Stari Banovci | Serbia | 708 | 2012 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 417.800 | | | | | | | | | | | | | | | | | |
Hotel | public buildings | hotel with pool | Primorje | Montenegro | 574 | 2012 | preliminary design brief | | 353.230 | | | | | | | | | | | | | | | | | |
Gating | industrial & logistics buildings | warehouse facility with business spaces and a commercial showroom | Sremčica | Serbia | 2.949 | 2011 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.474.500 | | | | | | | | | | | | | | | | | |
Jet Set | industrial & logistics buildings | warehouse facility | Stara Pazova | Serbia | 3.992 | 2011 | urban project design, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 1.145.300 | | | | | | | | | | | | | | | | | |
ECOC S.A. | commercial buildings | | Ekvatorijalna Gvineja | Equatorial Guinea | 5.035 | 2011 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 1.297.800 | | | | | | | | | | | | | | | | | |
Simonović | commercial buildings | | Novi Banovci | Serbia | 1.943 | 2011 | preliminary design brief | | 971.500 | | | | | | | | | | | | | | | | | |
Mitrović Var II | commercial buildings | | Stari Banovci | Serbia | 1.146 | 2011 | preliminary design brief | | 401.100 | | | | | | | | | | | | | | | | | |
Porodična kuća | residential buildings | | Nova Pazova | Serbia | 230 | 2011 | preliminary design brief | | 135.725 | | | | | | | | | | | | | | | | | |
Mitrić | residential buildings | | Stara Pazova | Serbia | 256 | 2011 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 89.600 | | | | | | | | | | | | | | | | | |
Ivović | residential buildings | | Sopot | Serbia | 105 | 2011 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 34.650 | | | | | | | | | | | | | | | | | |
Muždeka | residential buildings | | Nova Pazova | Serbia | 277 | 2011 | preliminary design brief | completed | 91.450 | | | | | | | | | | | | | | | | | |
Eurocentar | public buildings | commercial, hospitality and office spaces, hotel, housing | Nova Pazova | Serbia | 7.629 | 2011 | preliminary design brief | | 4.577.400 | | | | | | | | | | | | | | | | | |
Gradski centar | competitions | commercial spaces, hospitality, services, tourism, culture, recreation, municipal administration | Zlatibor | Serbia | 18.867 | 2011 | preliminary design brief | II prize | | | | | | | | | | | | | | | | | | |
Hotel | competitions | hotel resort | Ulcinj | Montenegro | 24.800 | 2011 | preliminary design brief | | | | | | | | | | | | | | | | | | | |
Open Mind | industrial & logistics buildings | warehouse facility with business offices | Šimanovci | Serbia | 17.952 | 2010 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 4.614.700 | | | | | | | | | | | | | | | | | |
Slovcom | industrial & logistics buildings | warehouse facility with business spaces for construction material trading company | Šimanovci | Serbia | 4.113 | 2010 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 903.900 | | | | | | | | | | | | | | | | | |
Automotive | industrial & logistics buildings | facility for the production of heaters for the needs of the automotive industry | Inđija | Serbia | 7.481 | 2010 | preliminary design brief | | 1.644.100 | | | | | | | | | | | | | | | | | |
Montenomax | industrial & logistics buildings | warehouse facility | Danilovgrad | Montenegro | 3.852 | 2010 | preliminary design brief | completed | 846.550 | | | | | | | | | | | | | | | | | |
Renault | industrial & logistics buildings | truck service | Šimanovci | Serbia | 1.832 | 2010 | preliminary design brief | | 402.600 | | | | | | | | | | | | | | | | | |
Studija - Zgrade u nizu | commercial buildings | | Ekvatorijalna Gvineja | Equatorial Guinea | 670 | 2010 | preliminary design brief | | 335.000 | | | | | | | | | | | | | | | | | |
Studija - Kuće u nizu | residential buildings | | | Equatorial Guinea | 135 | 2010 | preliminary design brief | | 67.500 | | | | | | | | | | | | | | | | | |
Bešlić | residential buildings | | Batajnica | Serbia | 343 | 2010 | preliminary design brief | completed | 110.350 | | | | | | | | | | | | | | | | | |
Aqua Land | public buildings | swimming pool complex with ballroom | Stari Banovci | Serbia | 2.211 | 2010 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 2.653.200 | | | | | | | | | | | | | | | | | |
Fasada II | interiors | indoor pool | Stari Banovci | Serbia | 50 | 2010 | preliminary design brief | | 45.000 | | | | | | | | | | | | | | | | | |
MD International | industrial & logistics buildings | distribution center | Dobanovci | Serbia | 24.482 | 2009 | location spatial possibilities & requirements research, preliminary design brief | | 7.528.550 | | | | | | | | | | | | | | | | | |
Kuća na Dunavu | residential buildings | | Slankamen | Serbia | 815 | 2009 | preliminary design brief | | 262.250 | | | | | | | | | | | | | | | | | |
Hotel Terzić | public buildings | hotel | Stara Pazova | Serbia | 4.819 | 2009 | preliminary design brief | | 2.891.400 | | | | | | | | | | | | | | | | | |
Center and city square | public buildings | urban design & furnishing | Jakovo | Serbia | 6.200 | 2009 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 310.000 | | | | | | | | | | | | | | | | | |
Fasada I | interiors | business spaces | Stara Pazova | Serbia | 669 | 2009 | preliminary design brief, PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 602.100 | | | | | | | | | | | | | | | | | |
Tranšped | industrial & logistics buildings | logistics center with storage facilities and an office building | Vrčin | Serbia | 37.044 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 6.564.900 | | | | | | | | | | | | | | | | | |
Trampex I | industrial & logistics buildings | warehouse facility | Dobanovci | Serbia | 1.372 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 480.300 | | | | | | | | | | | | | | | | | |
Gombit | industrial & logistics buildings | factory for the production of dried meat products | Inđija | Serbia | 2.465 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 1.500.000 | | | | | | | | | | | | | | | | | |
Žarković | industrial & logistics buildings | warehouse | Batajnica | Serbia | 1.365 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 477.800 | | | | | | | | | | | | | | | | | |
Todorović | industrial & logistics buildings | warehouse | Batajnica | Serbia | 1.461 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 584.400 | | | | | | | | | | | | | | | | | |
Interfrigo | industrial & logistics buildings | production, assembly and service of refrigeration and air conditioning devices | Altina | Serbia | 1.220 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 488.000 | | | | | | | | | | | | | | | | | |
LAD Group | residential buildings | | Voždovac | Serbia | 736 | 2008 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 236.800 | | | | | | | | | | | | | | | | | |
Muzej savremene umetnosti | competitions | museum with open pubic space | Novi Sad | Serbia | 23.591 | 2008 | preliminary design brief | buy-out | | | | | | | | | | | | | | | | | | |
Gatarić II | industrial & logistics buildings | business-storage facility for school and office supplies | Krnješevci | Serbia | 4.900 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 2.082.500 | | | | | | | | | | | | | | | | | |
Gatarić I | industrial & logistics buildings | business-storage facility for school and office supplies | Krnješevci | Serbia | 4.912 | 2007 | preliminary design brief | | 2.087.600 | | | | | | | | | | | | | | | | | |
Multipartner II | industrial & logistics buildings | sale and service of trucks and large passenger vehicles | Batajnica | Serbia | 5.304 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 2.652.000 | | | | | | | | | | | | | | | | | |
Fratelis | industrial & logistics buildings | a facility for the production of furniture with business offices | Batajnica | Serbia | 2.562 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 1.024.800 | | | | | | | | | | | | | | | | | |
Evropaokovi | industrial & logistics buildings | warehouse facility | Nova Pazova | Serbia | 4.800 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 1.920.000 | | | | | | | | | | | | | | | | | |
Eurokamioni | industrial & logistics buildings | warehouse facility | Šimanovci | Serbia | 1.600 | 2007 | preliminary design brief | | 680.000 | | | | | | | | | | | | | | | | | |
Doming II | industrial & logistics buildings | commercial center with business spaces and a hotel | Šimanovci | Serbia | 5.200 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 2.080.000 | | | | | | | | | | | | | | | | | |
Goty | industrial & logistics buildings | warehouse with business space | Krnješevci | Serbia | 3.000 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 1.200.000 | | | | | | | | | | | | | | | | | |
Bon komerc | industrial & logistics buildings | business-warehouse facility | Inđija | Serbia | 1.400 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 560.000 | | | | | | | | | | | | | | | | | |
FOM | industrial & logistics buildings | production facility | Dobanovci | Serbia | 668 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 254.000 | | | | | | | | | | | | | | | | | |
Simonović | commercial buildings | | Novi Banovci | Serbia | 1.564 | 2007 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 530.100 | | | | | | | | | | | | | | | | | |
Poslovni objekat | competitions | | Beograd | Serbia | 9.053 | 2007 | preliminary design brief | | | | | | | | | | | | | | | | | | | |
Multipartner I | industrial & logistics buildings | sale and service of trucks and large passenger vehicles | Dobanovci | Serbia | 4.800 | 2006 | location spatial possibilities & requirements research, preliminary design brief | | 1.500.000 | | | | | | | | | | | | | | | | | |
Skoko, Stojanović | industrial & logistics buildings | warehouse with business space | Stara Pazova | Serbia | 5.900 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 1.770.000 | | | | | | | | | | | | | | | | | |
Sanja ippi | industrial & logistics buildings | production and storage complex for the production of plastic goods | Stara Pazova | Serbia | 32.300 | 2006 | location spatial possibilities & requirements research, preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 3.700.000 | | | | | | | | | | | | | | | | | |
Sekulić | industrial & logistics buildings | cold storage facility | Ugrinovci | Serbia | 800 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 2.200.000 | | | | | | | | | | | | | | | | | |
Kleeman | industrial & logistics buildings | logistics center | Šimanovci | Serbia | 3.000 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 900.000 | | | | | | | | | | | | | | | | | |
Royal | industrial & logistics buildings | warehouse with business space | Stara Pazova | Serbia | 2.400 | 2006 | preliminary design brief | | 800.000 | | | | | | | | | | | | | | | | | |
Tehnomerkur | industrial & logistics buildings | warehouse with business space | Stara Pazova | Serbia | 12.000 | 2006 | preliminary design brief | | 3.600.000 | | | | | | | | | | | | | | | | | |
Marković | industrial & logistics buildings | production of prochronic haberdashery with business offices | Nova Pazova | Serbia | 1.200 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 400.000 | | | | | | | | | | | | | | | | | |
Drvoprodukt | industrial & logistics buildings | business-storage facility with a commercial showroom for a ceramics trade company | Stara Pazova | Serbia | 7.100 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 2.130.000 | | | | | | | | | | | | | | | | | |
Bon Komerc | commercial buildings | | Inđija | Serbia | 4.800 | 2006 | preliminary design brief | | 1.920.000 | | | | | | | | | | | | | | | | | |
Stokić | commercial buildings | | Stara Pazova | Serbia | 9.850 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 3.800.000 | | | | | | | | | | | | | | | | | |
Savić | commercial buildings | | Novi Banovci | Serbia | 750 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 270.000 | | | | | | | | | | | | | | | | | |
Jet Set | commercial buildings | | Beograd | Serbia | 1.930 | 2006 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 750.000 | | | | | | | | | | | | | | | | | |
Fasada | industrial & logistics buildings | factory for the production of facade paints and plasters | Stara Pazova | Serbia | 3.900 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 700.000 | | | | | | | | | | | | | | | | | |
Fruit World II | industrial & logistics buildings | facility for storing apples in a controlled temperature | Nova Pazova | Serbia | 2.500 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision, construction management | completed | 720.000 | | | | | | | | | | | | | | | | | |
Fruit World I | industrial & logistics buildings | facility for storing apples and bananas in a controlled temperature | Nova Pazova | Serbia | 2.500 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision, construction management | completed | 600.000 | | | | | | | | | | | | | | | | | |
Keramika Kamen | industrial & logistics buildings | ceramics showroom salon with business space | Stara Pazova | Serbia | 450 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 110.000 | | | | | | | | | | | | | | | | | |
Optimo San | industrial & logistics buildings | facility for the production of memory foam mattresses | Nova Pazova | Serbia | 3.100 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 900.000 | | | | | | | | | | | | | | | | | |
Auto Vrbas | industrial & logistics buildings | warehouse facility for automobile parts with business spaces | Stara Pazova | Serbia | 2.200 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 800.000 | | | | | | | | | | | | | | | | | |
Prostran | industrial & logistics buildings | warehouse facility | Zemun | Serbia | 1.900 | 2005 | preliminary design brief | | 600.000 | | | | | | | | | | | | | | | | | |
Kukolj | industrial & logistics buildings | warehouse facility | Zemun | Serbia | 1.800 | 2005 | preliminary design brief | | 600.000 | | | | | | | | | | | | | | | | | |
Đuka Pool | industrial & logistics buildings | factory for the production of polyurethane foam | Zemun | Serbia | 3.500 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 900.000 | | | | | | | | | | | | | | | | | |
Mijokov | industrial & logistics buildings | warehouse facility | Belgrade | Serbia | 850 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 450.000 | | | | | | | | | | | | | | | | | |
Kalinić | commercial buildings | | Nova Pazova | Serbia | 491 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 250.000 | | | | | | | | | | | | | | | | | |
Jovanović | commercial buildings | | Stara Pazova | Serbia | 1.635 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 820.000 | | | | | | | | | | | | | | | | | |
Ktajišnik | commercial buildings | | Nova Pazova | Serbia | 1.273 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 635.000 | | | | | | | | | | | | | | | | | |
Čurulić | commercial buildings | | Beograd | Serbia | 1.760 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 900.000 | | | | | | | | | | | | | | | | | |
Tovarlaza | commercial buildings | | Nova Pazova | Serbia | 365 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | | 186.650 | | | | | | | | | | | | | | | | | |
Mirković | residential buildings | | Pančevo | Serbia | 97 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 49.000 | | | | | | | | | | | | | | | | | |
Štrbac | residential buildings | | Stari Banovci | Serbia | 123 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 62.000 | | | | | | | | | | | | | | | | | |
Pantović | residential buildings | | Stari Banovci | Serbia | 137 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 69.000 | | | | | | | | | | | | | | | | | |
Štrbac | residential buildings | | Stari Banovci | Serbia | 160 | 2005 | preliminary design brief | | 73.000 | | | | | | | | | | | | | | | | | |
Knežević | residential buildings | | Stari Banovci | Serbia | 245 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 125.000 | | | | | | | | | | | | | | | | | |
Dedijer | residential buildings | | Nova Pazova | Serbia | 285 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 128.250 | | | | | | | | | | | | | | | | | |
Jelić | residential buildings | | Zemun | Serbia | 265 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 130.000 | | | | | | | | | | | | | | | | | |
Stamblija | residential buildings | | Zemun | Serbia | 295 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 148.000 | | | | | | | | | | | | | | | | | |
Zubović | residential buildings | | Nova Pazova | Serbia | 320 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 160.000 | | | | | | | | | | | | | | | | | |
Čaušević | residential buildings | | Stara Pazova | Serbia | 388 | 2005 | preliminary design brief | | 194.000 | | | | | | | | | | | | | | | | | |
Nonković | residential buildings | | Stari Banovci | Serbia | 500 | 2005 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 225.000 | | | | | | | | | | | | | | | | | |
Jovanović, Ćesarević | industrial & logistics buildings | factory for the production of plastic haberdashery | Nova Pazova | Serbia | 1.400 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 600.000 | | | | | | | | | | | | | | | | | |
Koplas YU | industrial & logistics buildings | production and storage facility | Nova Pazova | Serbia | 700 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 350.000 | | | | | | | | | | | | | | | | | |
Skoko, Stanojevski | industrial & logistics buildings | warehouse facility with business offices | Nova Pazova | Serbia | 2.500 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 800.000 | | | | | | | | | | | | | | | | | |
Stojanović | industrial & logistics buildings | warehouse facility with business offices | Nova Pazova | Serbia | 2.200 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 550.000 | | | | | | | | | | | | | | | | | |
Glaccier | industrial & logistics buildings | service and commercial center for trucks and passenger vehicles | Šimanovci | Serbia | 3.000 | 2004 | preliminary design brief | | 950.000 | | | | | | | | | | | | | | | | | |
Agripromet | industrial & logistics buildings | production facility | Nova Pazova | Serbia | 700 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 350.000 | | | | | | | | | | | | | | | | | |
Pam alatnica | industrial & logistics buildings | production and warehouse facility | Stari Banovci | Serbia | 900 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 430.000 | | | | | | | | | | | | | | | | | |
Popović | industrial & logistics buildings | production facility | Krčedin | Serbia | 300 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 150.000 | | | | | | | | | | | | | | | | | |
Mahagoni Deco | industrial & logistics buildings | production and storage facility for a furniture production company | Nova Pazova | Serbia | 1.400 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 400.000 | | | | | | | | | | | | | | | | | |
Lazić | residential buildings | | Nova Pazova | Serbia | 178 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 80.100 | | | | | | | | | | | | | | | | | |
Gusavac | residential buildings | | Nova Pazova | Serbia | 180 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 81.000 | | | | | | | | | | | | | | | | | |
Andrić | residential buildings | | Stari Banovci | Serbia | 212 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 85.000 | | | | | | | | | | | | | | | | | |
Uzelac | residential buildings | | Batajnica | Serbia | 220 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 90.000 | | | | | | | | | | | | | | | | | |
Orescanin | residential buildings | | Stara Pazova | Serbia | 225 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 101.250 | | | | | | | | | | | | | | | | | |
Werner | residential buildings | | Golubinci | Serbia | 211 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 105.000 | | | | | | | | | | | | | | | | | |
Milošević | residential buildings | | Nova Pazova | Serbia | 252 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 113.400 | | | | | | | | | | | | | | | | | |
Jeremić | residential buildings | | Belegiš | Serbia | 283 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 115.000 | | | | | | | | | | | | | | | | | |
Dević | residential buildings | | Stara Pazova | Serbia | 268 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 120.000 | | | | | | | | | | | | | | | | | |
Bradas | residential buildings | | Batajnica | Serbia | 300 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 120.000 | | | | | | | | | | | | | | | | | |
Kosanović | residential buildings | | Stari Banovci | Serbia | 260 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 130.000 | | | | | | | | | | | | | | | | | |
Vranješ | residential buildings | | Stari Banovci | Serbia | 325 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 130.000 | | | | | | | | | | | | | | | | | |
Zeremski | residential buildings | | Novi Sad | Serbia | 252 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 130.000 | | | | | | | | | | | | | | | | | |
Vučetić | residential buildings | | Nova Pazova | Serbia | 284 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 140.000 | | | | | | | | | | | | | | | | | |
Talijan | residential buildings | | Stari Banovci | Serbia | 285 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 150.000 | | | | | | | | | | | | | | | | | |
Rebic | residential buildings | | Batajnica | Serbia | 335 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 170.000 | | | | | | | | | | | | | | | | | |
Radenković | residential buildings | | Ugrinovci | Serbia | 361 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 180.000 | | | | | | | | | | | | | | | | | |
Dragojević | residential buildings | | Novi Banovci | Serbia | 403 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 200.000 | | | | | | | | | | | | | | | | | |
Petrović | residential buildings | | Belgrade | Serbia | 470 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 240.000 | | | | | | | | | | | | | | | | | |
Dimitrijević | residential buildings | | Belgrade | Serbia | 473 | 2004 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 240.000 | | | | | | | | | | | | | | | | | |
Kleemann | industrial & logistics buildings | production of lifts with storage and business facilities | Šimanovci | Serbia | 1.300 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 300.000 | | | | | | | | | | | | | | | | | |
Doming I | industrial & logistics buildings | warehouse facility with business spaces for a company in trade of equipment for mechanical installations, water supplies and sewerage systems | Šimanovci | Serbia | 3.500 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 900.000 | | | | | | | | | | | | | | | | | |
Michel | industrial & logistics buildings | warehouse facility | Nova Pazova | Serbia | 800 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 250.000 | | | | | | | | | | | | | | | | | |
Konti | commercial buildings | | Moskva | Serbia | 10.000 | 2003 | preliminary design brief | | 5.000.000 | | | | | | | | | | | | | | | | | |
Konti | commercial buildings | | Moskva | Serbia | 10.000 | 2003 | preliminary design brief | | 5.000.000 | | | | | | | | | | | | | | | | | |
Petrović | residential buildings | | Belgrade | Serbia | 150 | 2003 | preliminary design brief | | 60.000 | | | | | | | | | | | | | | | | | |
Milas | residential buildings | | Stara Pazova | Serbia | 240 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 108.000 | | | | | | | | | | | | | | | | | |
Zubić | residential buildings | | Belgrade | Serbia | 300 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 120.000 | | | | | | | | | | | | | | | | | |
Jerićević | residential buildings | | Belgrade | Serbia | 300 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 120.000 | | | | | | | | | | | | | | | | | |
Hudjec | residential buildings | | Stara Pazova | Serbia | 310 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 140.000 | | | | | | | | | | | | | | | | | |
Zeremski | residential buildings | | Novi Sad | Serbia | 350 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 140.000 | | | | | | | | | | | | | | | | | |
Lazić | residential buildings | | Stara Pazova | Serbia | 340 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 140.000 | | | | | | | | | | | | | | | | | |
Bojanić | residential buildings | | Belgrade | Serbia | 350 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 140.000 | | | | | | | | | | | | | | | | | |
Opačić | residential buildings | | Batajnica | Serbia | 450 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 180.000 | | | | | | | | | | | | | | | | | |
Skoko | residential buildings | | Belgrade | Serbia | 400 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 200.000 | | | | | | | | | | | | | | | | | |
Kovačević | residential buildings | | Zemun | Serbia | 600 | 2003 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 240.000 | | | | | | | | | | | | | | | | | |
Milaš | industrial & logistics buildings | production of plastic goods facility | Nova Pazova | Serbia | 800 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 240.000 | | | | | | | | | | | | | | | | | |
Ambiental Eko | industrial & logistics buildings | facility for production of bamboo furniture | Zemun | Serbia | 1.200 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 350.000 | | | | | | | | | | | | | | | | | |
Jopex | industrial & logistics buildings | production facility | Nova Pazova | Serbia | 1.300 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 360.000 | | | | | | | | | | | | | | | | | |
Hammars | industrial & logistics buildings | production facility | Krnješevci | Serbia | 1.300 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 360.000 | | | | | | | | | | | | | | | | | |
M-Plast | industrial & logistics buildings | facility for production of plastic goods | Nova Pazova | Serbia | 1.000 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 300.000 | | | | | | | | | | | | | | | | | |
Verde | industrial & logistics buildings | juice production facility | Krnješevci | Serbia | 600 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 180.000 | | | | | | | | | | | | | | | | | |
Markoprogres | industrial & logistics buildings | production facility | Krnješevci | Serbia | 600 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 180.000 | | | | | | | | | | | | | | | | | |
Mićunović | residential buildings | | Nova Pazova | Serbia | 200 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 80.000 | | | | | | | | | | | | | | | | | |
Spisjak | residential buildings | | Stara Pazova | Serbia | 243 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 100.000 | | | | | | | | | | | | | | | | | |
Markoprogres | residential buildings | | Krnješevci | Serbia | 260 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 110.000 | | | | | | | | | | | | | | | | | |
Markićević | residential buildings | | Zemun | Serbia | 380 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 155.000 | | | | | | | | | | | | | | | | | |
Vujić | residential buildings | | Belgrade | Serbia | 380 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 160.000 | | | | | | | | | | | | | | | | | |
Mrdja | residential buildings | | Belgrade | Serbia | 680 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), construction carry out | completed | 280.000 | | | | | | | | | | | | | | | | | |
Hudjec | residential buildings | | Stara Pazova | Serbia | 800 | 2002 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 320.000 | | | | | | | | | | | | | | | | | |
Jakšić | commercial buildings | | Nova Pazova | Serbia | 600 | 2001 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 240.000 | | | | | | | | | | | | | | | | | |
Skoko | residential buildings | | Zlatibor | Serbia | 600 | 2001 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 250.000 | | | | | | | | | | | | | | | | | |
Skoko | residential buildings | | Nova Pazova | Serbia | 750 | 2001 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 300.000 | | | | | | | | | | | | | | | | | |
Petrović | residential buildings | | Belgrade | Serbia | 800 | 2001 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), engineering | completed | 320.000 | | | | | | | | | | | | | | | | | |
Djukanović | residential buildings | | Belgrade | Serbia | 850 | 2001 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), construction carry out | completed | 350.000 | | | | | | | | | | | | | | | | | |
Mitrović | industrial & logistics buildings | warehouse facility with business space for construction material trading company | Zemun | Serbia | 1.300 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 390.000 | | | | | | | | | | | | | | | | | |
Pegaz | industrial & logistics buildings | furniture production facility | Stara Pazova | Serbia | 1.300 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 390.000 | | | | | | | | | | | | | | | | | |
Union metal | industrial & logistics buildings | production of prochronic haberdashery with business offices | Stara Pazova | Serbia | 680 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 200.000 | | | | | | | | | | | | | | | | | |
Kotur | industrial & logistics buildings | production facility | Stara Pazova | Serbia | 680 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | | 200.000 | | | | | | | | | | | | | | | | | |
Kan Com | industrial & logistics buildings | furniture production facility | Nova Pazova | Serbia | 450 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 180.000 | | | | | | | | | | | | | | | | | |
Titan | industrial & logistics buildings | production facility | Nova Pazova | Serbia | 350 | 2000 | preliminary design brief | | 120.000 | | | | | | | | | | | | | | | | | |
Miličić | commercial buildings | | Stara Pazova | Serbia | 450 | 2000 | preliminary design brief | | 180.000 | | | | | | | | | | | | | | | | | |
Opština Lazarevac | commercial buildings | | Lazarevac | Serbia | 2.500 | 2000 | preliminary design brief | | 1.000.000 | | | | | | | | | | | | | | | | | |
Rodić | residential buildings | | Zemun | Serbia | 300 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 100.000 | | | | | | | | | | | | | | | | | |
Kuparic | residential buildings | | Zemun | Serbia | 200 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 100.000 | | | | | | | | | | | | | | | | | |
Brajković | residential buildings | | Zemun | Serbia | 250 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), construction carry out | completed | 120.000 | | | | | | | | | | | | | | | | | |
Gajić | residential buildings | | Belgrade | Serbia | 600 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 280.000 | | | | | | | | | | | | | | | | | |
Pavlović | residential buildings | | Belgrade | Serbia | 900 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 500.000 | | | | | | | | | | | | | | | | | |
Skoko | residential buildings | | Nova Pazova | Serbia | 500 | 2000 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 200.000 | | | | | | | | | | | | | | | | | |
Elmar | industrial & logistics buildings | production and warehouse facility | Belgrade | Serbia | 1.500 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), building supervision | completed | 500.000 | | | | | | | | | | | | | | | | | |
Skoko | commercial buildings | | Nova Pazova | Serbia | 2.500 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 1.000.000 | | | | | | | | | | | | | | | | | |
M-Plast | commercial buildings | | Nova Pazova | Serbia | 1.200 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 480.000 | | | | | | | | | | | | | | | | | |
Džaleta | commercial buildings | | Zemun | Serbia | 800 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 320.000 | | | | | | | | | | | | | | | | | |
Dobnikar | residential buildings | | Zemun | Serbia | 200 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 80.000 | | | | | | | | | | | | | | | | | |
Jovanović | residential buildings | | Nova Pazova | Serbia | 250 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 100.000 | | | | | | | | | | | | | | | | | |
Bojić | residential buildings | | Zemun | Serbia | 360 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 150.000 | | | | | | | | | | | | | | | | | |
Kalaver | residential buildings | | Zemun | Serbia | 650 | 1999 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 260.000 | | | | | | | | | | | | | | | | | |
Purić | industrial & logistics buildings | production facility | Nova Pazova | Serbia | 800 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 250.000 | | | | | | | | | | | | | | | | | |
Panda | industrial & logistics buildings | toy production facility | Nova Pazova | Serbia | 800 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 250.000 | | | | | | | | | | | | | | | | | |
Obradović | industrial & logistics buildings | production facility for water preparation equipment | Zemun | Serbia | 800 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 320.000 | | | | | | | | | | | | | | | | | |
Obradović | commercial buildings | | Zemun | Serbia | 800 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems) | completed | 320.000 | | | | | | | | | | | | | | | | | |
Radenković | residential buildings | | Zemun | Serbia | 600 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 240.000 | | | | | | | | | | | | | | | | | |
Rajković | residential buildings | | Belgrade | Serbia | 600 | 1998 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), construction carry out | completed | 240.000 | | | | | | | | | | | | | | | | | |
Savić | industrial & logistics buildings | production facility | Stari Banovci | Serbia | 800 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 240.000 | | | | | | | | | | | | | | | | | |
Vukić | industrial & logistics buildings | production facility | Nova Pazova | Serbia | 600 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 180.000 | | | | | | | | | | | | | | | | | |
Drina Plast | industrial & logistics buildings | production of plastic goods facility | Nova Pazova | Serbia | 1.200 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 360.000 | | | | | | | | | | | | | | | | | |
Bosnic | industrial & logistics buildings | production of plastic goods facility | Nova Pazova | Serbia | 800 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 250.000 | | | | | | | | | | | | | | | | | |
Dada | industrial & logistics buildings | production of plastic goods facility | Nova Pazova | Serbia | 1.200 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 350.000 | | | | | | | | | | | | | | | | | |
So produkt | industrial & logistics buildings | salt packaging and distribution facility | Stara Pazova | Serbia | 2.400 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution), construction carry out | completed | 800.000 | | | | | | | | | | | | | | | | | |
Milošević | residential buildings | | Zemun | Serbia | 550 | 1997 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), building supervision | completed | 220.000 | | | | | | | | | | | | | | | | | |
Metal Flex | industrial & logistics buildings | production of metal goods facility | Nova Pazova | Serbia | 1.100 | 1996 | preliminary design brief, PBP - project for building permit (design documentation for obtaining construction & operation permit, including energy network with water and electricity systems), PEP - project execution plan (technical documentation & detail design of construction works execution) | completed | 300.000 | | | | | | | | | | | | | | | | | |
Mitrović | commercial buildings | | Zemun | Serbia | 800 | 1996 | preliminary design brief | | 320.000 | | | | | | | | | | | | | | | | | |